Monday, 3 June 2013

Stud work

Stud work

In this task we had to make a z frame out of 2 by 4 millimetres this task lasted us 3/4 weeks.

The tools we used was:
 battery driver


 tape measure


 step ups.

The  materials we used was:

 Philip head Screws



The P.P.E we used was:
saftey boots,



No comments:

Post a Comment